We worked in two locations, forming up first in Duranceaux Park
Viewed: 673 times.
|
We began with an overgrown raised bed alongside Fishinger.
Viewed: 645 times.
|
If anything other than trees had been in the garden, it was long-since crowded out.
Viewed: 600 times.
|
Honeysuckle was hanging over the stone border.
Viewed: 623 times.
|
In just a few minutes, the bed was cleared out.
Viewed: 596 times.
|
Then, we started on the hillside by the end of the bridge.
Viewed: 604 times.
|
The slope was a tangle of honeysuckle and grapevine.
Viewed: 615 times.
|
We pulled the tangle apart and hauled cuttings to the chipper crew.
Viewed: 635 times.
|
We filled this truck three times before the day's work was done.
Viewed: 580 times.
|